Roof Lifting

ABC Tissues

Size
16,500m²
Work Completed
  • Roof Lifting
Location
  • Bibra Lake, WA

ACG raised the roof of this high-volume production facility by 2.5 metres across 16,500m² of floor area. The lift added 41,250m³ of storage capacity for the client, increasing usability and maximising the existing structure.

Project Gallery

Have a project in mind?